I would cut the studs about 12 from the top plate.
Raising garage roof height cutting studs and sheathing.
Finally fill in the outside of the wall with tapered pieces of sheathing and siding.
Then you can attach cripples that extend down to the bottom plate to these short upper studs.
Then complete the roof frame by adding the 2 6 subfascia and building the side and end overhangs.
When sheathing garage walls especially on a concrete floor use a temporary spacer such as strips of plywood to raise them off the floor about 3 8 1 2 while fastening them to the wall or measuring for cutouts.
Temporary spacers are set under the sheet to raise it off the floor a bit.
Stud spaces with a 8 long 2 x 4 we will fall short of meeting the center of the seventh stud by 3 4.
So companies like norbord started creating tallwall windstorm panels to help alleviate this.
Below the top of the foundation wall.
How doesn t matter a chain saw would work.
Before applying the finish siding install metal flashing over the sheathing and let the flashing run 3 in.
The crew member cutting the studs then simply butts the stop to the end of the stock draws a line and cuts the board to length.
The reason for this is that we will be placing 1 2 thick plywood or oriented strand board osb structural sheathing all the way around the perimeter.
The death of the 8 sheet one of the biggest items when sheathing a wall vertically is that the sheathing has to be continuous 602 10 4 5 which meant that an 8 sheet wouldn t cut it in many places so longer ones were required.
To correct a slight dip in the floor we established a benchmark height with a laser level and nailed 2x6 squash blocks to the sides of the existing floor joists.
With the dormer roof raised and supported we cut away the part of the original roof that was still in place leaving the exposed ends of the floor joists.
Studs for the house walls come pre cut from the lumber supplier.
So we will cut the 9 2 x 4s to a length of 8 0 3 4 for both the sole and top.
When you re done with the roof frame cut 1 2 in.
Match the overhangs to the overhangs on the garage.
Lifting jig extending studs.
You can do this to every other stud without much fear of problems.
Reinforce the connection between the rafters and the tie plate with metal hurricane ties.
Sheathing to fit and nail it to the rafters.
If you believe raising the roof is your best option here is how i would do it.
As one person pushes the stud into line another can drive the nail home thereby holding the crooked stud in its proper position.